www.146.net

Engineering Achievements

Project Search

By keyword search

By region Search

Date:
Area:

Location: Home(英) / Businiess Areas / Investment / Content

Chengbei Waste Water Treatment Plant in Pizhou

Fontsize:BIG MIDDLE SMALL

Introduction:

This project was constructed by Pizhou CAMCE Waterworks Co., Ltd., a wholly-owned subsidiary of CAMCE, in the form of BOT (Build-Operate-Transfer). With a concession period of 30 years (including construction period and operation period), it includes the construction of an urban Waste Water treatment plant with a daily treatment capacity of 40,000m3. The plant was put into operation in June 2009.


Interior of the Biochemical Tank of Chengbei Waste Water Treatment Plant

 

Laboratory of Chengbei Waste Water Treatment Plant

 

 

XML 地图 | Sitemap 地图